骚片av蜜桃精品一区_中文字幕无码毛片免费看_丝袜 亚洲 另类 欧美 变态_亚洲一区二区三区四区五区黄_亚洲中文字幕无码av

上海金泰工程機(jī)械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

无码骚夜夜精品| 无码中文av有码中文av| 日韩乱码人妻无码中文字幕久久| 亚洲精品久久久蜜桃| 西西午夜无码大胆啪啪国模| 亚洲av色无码乱码在线观看| 亚洲av色香蕉一区二区三区老师| 乱色精品无码一区二区国产盗| 国产女人和拘做受视频免费| 亚洲欧美日本a∨在线观看| 久精品国产欧美亚洲色aⅴ大片| 亚洲国产成人久久综合区| 久久99精品久久久久久| 国产最新进精品视频| 边做饭边被躁bd苍井空图片| 无码国产一区二区三区四区| 精品99日产一卡2卡三卡4| 久久久久久九九99精品| 又粗又黑又大的吊av| 久久精品aⅴ无码中文字字幕重口| 久久精品国产99精品国产亚洲性色| 门国产乱子视频观看| 国产三区在线成人av| 亚洲av最新在线网址| 国产精品久久久久久久久岛| 激情人妻另类人妻伦| 狼人大香伊蕉国产www亚洲| 国产av亚洲精品ai换脸电影| 无码人妻久久一区二区三区蜜桃| 在线播放免费人成毛片乱码| 最近中文字幕完整版| 亚洲国产精品久久一线不卡| 激情内射亚州一区二区三区爱妻| 日韩精品久久久久久免费| 免费国产黄网站在线观看视频| 两个女人互添下身视频在线观看| 色窝窝无码一区二区三区| 国产午夜成人免费看片| 精品国产乱码久久久久久浪潮| 内射无码专区久久亚洲| 人妻被按摩师玩弄到潮喷|