骚片av蜜桃精品一区_中文字幕无码毛片免费看_丝袜 亚洲 另类 欧美 变态_亚洲一区二区三区四区五区黄_亚洲中文字幕无码av

上海金泰工程機械有限公司
上海安亭洛浦路45號 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

帅小伙自慰videogay男男| 台湾佬中文娱乐网22| 男女18禁啪啪无遮挡激烈网站| 97热久久免费频精品99| 久久精品中文无码资源站| 无套内谢老熟女| 人妻少妇久久久久久97人妻| 97日日碰人人模人人澡| 色噜噜狠狠狠综合曰曰曰| 欧美精品亚洲精品日韩传电影| 黄色视频在线观看免费| 我爱我色成人网| 国产真实夫妇交换视频| 久久人人妻人人爽人人爽| 日本熟妇人妻xxxxx-欢迎您| 久久精品第九区免费观看| 一边添奶一边添p好爽视频| 亚洲av无码一区二区三区在线| 人妻无码熟妇乱又伦精品视频| 蜜臀精品无码av在线播放| 亚洲裸男自慰gv网站| 国产国产人免费人成免费视频| 亚洲av无码av吞精久久| 久久精品欧美日韩精品| 四虎影库久免费视频| 五月丁香久久综合网站| 亚洲国产中文字幕在线视频综合| 亚洲女久久久噜噜噜熟女| 无遮挡18禁啪啪免费观看| 欧美日韩一区二区三区在线观看视频| 国产日韩av免费无码一区二区| 男女啪啪免费体验区| 国产欧美精品一区二区三区| 毛茸茸性xxxx毛茸茸毛茸茸| 亚洲第一成人网站| 亚洲性爱视频| 日本三级香港三级人妇99| 色欲欲www成人网站| 国模冰莲自慰肥美胞极品人体图| 国产精品无码无在线观看| 女人与公拘交酡全过程|