骚片av蜜桃精品一区_中文字幕无码毛片免费看_丝袜 亚洲 另类 欧美 变态_亚洲一区二区三区四区五区黄_亚洲中文字幕无码av

上海金泰工程機械有限公司
上海安亭洛浦路45號 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

亚洲爆乳无码一区二区三区| 精品视频无码一区二区三区| 成年女性特黄午夜视频免费看| 中文字幕成熟丰满人妻| 色妺妺视频网| 免费国精产品自偷自偷免费看| 天天躁日日躁狠狠躁欧美老妇小说| 各种少妇正面着bbw撒尿视频| 无码av波多野结衣| 五月丁香综合激情六月久久| www婷婷av久久久影片| 亚洲日韩国产一区二区三区| 人人做人人妻人人精| 精品人妻大屁股白浆无码| 国产精品扒开腿做爽爽爽a片唱戏| 亚洲av第一成肉网| 欧美国产激情18| 久久久国产打桩机| 精品人伦一区二区三电影| 国产午夜成人av在线播放| 东北少妇不带套对白| 亚洲av无码专区国产不卡顿| √最新版天堂资源网在线| 和岳每晚弄的高潮嗷嗷叫视频| 曰批免费视频播放免费| 久久久久无码国产精品不卡| 亚洲中国最大av网站| 国产日韩制服丝袜第一页| 久久精品九九热无码免贵| 无码人妻久久一区二区三区不卡| 亚洲av无码专区国产不卡顿| 精品丝袜人妻久久久久久| 大又大粗又爽又黄少妇毛片免费| 亚洲av成人片无码| 无码人妻一区二区三区免费看| 国产成熟妇女性视频电影| 精品人妻av区波多野结衣| 人妻无码一区二区三区四区| 日韩亚洲欧美中文高清在线| 一个人看的www视频免费观看| 邻居少妇张开腿让我爽了一夜|